Lightning Power Ltd.
Lightning Power S1 Low-Emission Plant
- Power Plant
- Size 1
- Stealth
- Grade B
Specification
- Price
- 13 100aUEC
- Power output
- 3 150
- Thermal load
- 180
Reference seed value for the seeded patch — verify against current game data.
Where to buy
| Shop | Location | Price | Status |
|---|---|---|---|
| Platinum Bay | Stanton · ArcCorp · Baijini Point | 13 100aUEC | In stock |
| Platinum Bay | Stanton · Hurston · Everus Harbor | 13 100aUEC | In stock |
| Platinum Bay | Stanton · microTech · Port Tressler | 13 100aUEC | In stock |